This was a 20 story elevator shaft Addition/Renovation that was fabricated in pods/cells of four stories. Each Pod had every other story with decking installed for safety measures as we erected with 120 Ton Hydraulic subcontracted crane. All Fabrication was done in house and Field Labor minimized due to the safety concerns. All moments welds 100% completed and done in house prior to delivery.

Weight: 34 Tons

Contractor:
KBE

Architect:
Kanalstein Banton

Engineer:
Engineer