Seaport

Location: Boston, MA

Contractor: Skanska USA Building, Inc.

Architect: Kling Stubbins

Engineer: Kling Stubbins

Weight: 5000 Tons

Using 5,000 tons of steel and encompassing 18 stories, the Seaport project kept both our Structural Steel shop and fields crews busy. We set the truss on at the end of September 2014 while our Miscellaneous Metals team started work in fabricating and installing 300 feet of railings, seven sets of stairs, wrapping 22 elevator doors in stainless steel and 12 thirty-foot tall columns with aluminum covers.

In addition, steel barrier cables and 70 bike racks were placed in the underground garage. This project is a great example of the breadth of our abilities, from both divisions!